top of page
final-assembly.jpg

Installation Guide

A precise beginning for a kinetic expression of time.

Please read the complete installation sequence before proceeding.
Always use the supplied gloves when handling any component.

Proceed slowly and precisely, as if completing a ritual.

This kinetic art object is composed of precision gears, rails, and a magnetic drive system. Avoid impact or twisting during installation, and work on a stable, level table.
unboxing.jpg

Inside the Case

Open the carrying case and confirm that all three components are present before proceeding: Box A, Box B, and the Glass Cover.
Handle each item with the supplied gloves and place it on a clean, stable surface.

Drive Base

Contains the Drive Base.

Main Body / Time Display Assembly

Contains the Main Body / Time Display Assembly.

Glass Cover

Keeps the installed object free from dust when not in use.

RECOMMENDED SETUP

Two adults should perform the installation in an area inaccessible to children and pets.

HANDLING PRINCIPLE

Do not lift the assembly by its rails or gears. Support only the designated frame areas with both hands.

Connect the Power

Check the supplied components, then connect the Drive Base and USB power adapter in sequence.

01

Check the components

Confirm the gloves, USB power adapter, USB cable, Magnetic Viewer Film, and spirit level.

02

Connect the Drive Base

While wearing the supplied gloves, connect the USB cable to the rear port of the Drive Base.

03

Connect the power adapter

Connect the USB cable to the USB power adapter, then plug the adapter into a power outlet.

IMPORTANT

Leave enough slack so the cable is not sharply bent, stretched, or pulled.

Verify Operation and Level

After connecting the power, verify operation with the Magnetic Viewer Film, then level the Drive Base.

base check

base check

Verify magnetic operation

With the power connected, place the Magnetic Viewer Film over the indicated area. A visible rotating pattern confirms that the Drive Base is operating correctly.

Level the Drive Base

Place the supplied spirit level at the center of the Drive Base. Adjust the installation surface until the bubble is centered between the guide lines.

CORRECT SEQENCE

Always proceed in this order: connect power → verify magnetic operation → level the Drive Base.

Install the Main Body

Inspect the gears and rails, then place the Main Body onto the Drive Base in the correct orientation.

01. Inspect the gears

Before lifting the Main Body, inspect its condition and confirm that the designated gear moves smoothly in both directions.

03. Lower vertically

Support the frame and lower the Main Body vertically. Do not apply pressure to the rails or gears.

02. Align the orientation

Position the assembly so the chronoMeans name on the Drive Base faces the front of the Main Body.

04. Confirm rotation

After installation, confirm that the magnetic wheel rotates steadily clockwise.

Important

If the Main Body is tilted or the wheel rotates irregularly, disconnect the power immediately and recheck the level and seating.

Place the Balls
and Perform Final Checks

Use the tweezers to place the balls on the rail according to the current time.

Use exactly 30 balls. Do not place them by hand or press down on the rails.

30 balls

Confirm that exactly 30 balls are installed.

Level

Confirm that the product remains stable and level.

Clockwise

Confirm that the magnetic wheel rotates clockwise.

Glass cover

Install the Glass Cover only after all checks are complete.

How to Set the Time

How to Set the Time

The bird fights its way out of the egg. The egg is the world. Who would be born must first destroy a world. The bird flies to God.
That God's name is ...

Copyright © 2012 - 2026 by ABRASAX Design Group. | All Rights Reserved |

 
bottom of page